Pictures
Up

 

 

These are pictures I took of A-Pillar gauge pod installation

 

Gauge Pod 001.jpg (42514 bytes) Gauge Pod 003.jpg (44902 bytes) Gauge Pod 004.jpg (44696 bytes) Gauge Pod 006.jpg (43917 bytes) Gauge Pod 009.jpg (54009 bytes)
Locate Fuse Panel on Drivers Side Dash Select Fuse Location Remove A-pillar Cover Connect Hot Lead & Ground  Route Wiring Behind Dash
Gauge Pod 011.jpg (50145 bytes) Gauge Pod 013.jpg (42654 bytes) Gauge Pod 012.jpg (38932 bytes) Gauge Pod 015.jpg (47847 bytes) Gauge Pod 014.jpg (44044 bytes)
Gauge Pod & Gauges Installed Back of A-pillar Cover Installing Gauge in Pod Auto Meter Installation Instructions Auto Meter Gauges
Gauge Pod 017.jpg (34323 bytes) Gauge Pod 018.jpg (34243 bytes) Gaugepod2.jpg (55881 bytes) Gauge Pod 021.jpg (39293 bytes)
Installation Complete Sending Unit Manifold
Gauge Pod 022.jpg (51371 bytes) Gauge Pod 023.JPG (57988 bytes)

Electrical Connection to Manifold

Fish Wire thru firewall grommet